Project Pankow
8.01 kWp with 10 kWh storage (HUAWEI)
Despite the challenging roof surface (hot water panels, running system), we found the optimum module layout. An unshaded strip above the panels was used, optimizers made it possible to cover the dormer sides and roof areas. The cable route was finished with aluminum tubing, and the inverter and storage system were installed in the basement.